Servers, storage and HCI
for Milton Keynes data centres and on-prem.
Servnet designs, supplies and deploys server, storage and HCI infrastructure for MK businesses — Dell PowerEdge R / XE, HPE ProLiant + Alletra MP, Lenovo ThinkSystem, Pure FlashArray, NetApp ONTAP, Nutanix Cloud Platform and NVIDIA GPU servers. Built for the Bucks DC cluster (ARK Cody, Pulsant MKE, Vorboss, Equinix LD4 nearby), corporate-HQ scale workloads, NHS BLMK, plus OU + Cranfield research.
Why MK server + storage work has its own profile
MK workloads span corporate-HQ scale (John Lewis, Network Rail, VW FS, Mercedes-Benz UK) plus NHS BLMK, OU distance-learning at scale, F1 simulation.
High-throughput compute for corporate HQs
Dell PowerEdge + HPE ProLiant for John Lewis / Network Rail / VW FS / Mercedes-Benz UK at corporate-HQ scale.
HCI for NHS BLMK + MK Council
Nutanix Cloud Platform for NHS BLMK + MK Council estates.
25 / 100 GbE fabric for Bucks DCs
Arista 7060X / 7050X, Cisco Nexus.
AI / GPU clusters for OU + Cranfield + Red Bull Racing
NVIDIA DGX B200 / GB200 for OU distance-learning AI, Cranfield research, Red Bull Racing CFD / simulation.
What Servnet builds in MK
Server design + supply
PowerEdge R260-R960; ProLiant DL360-DL580 Gen11; ThinkSystem.
Storage
All-flash block, scale-out NAS, hybrid file/object.
HCI
Nutanix AOS on AHV or ESXi for regulated estates.
AI / GPU infrastructure
NVIDIA DGX B200 / B300 / GB200, Supermicro HGX.
DC racking + cabling
Engineer attendance for racking at ARK Cody, Pulsant MKE, Vorboss.
Lifecycle support + warranty consolidation
Multi-vendor warranty consolidated.
MK infrastructure customers
- ▸John Lewis Partnership HQCorporate-HQ infrastructure + retail estate.
- ▸Network Rail HQNational rail-infrastructure cyber + IT support, 24×7 operational.
- ▸VW FS UK + Mercedes-Benz UKAutomotive-finance production infrastructure.
- ▸Red Bull Racing F1F1 race-tech + CFD / simulation compute.
- ▸NHS BLMK + 3 trustsMK NHS Trust, Bedfordshire Hospitals, ELFT — Nutanix HCI.
- ▸OU + Cranfield universitiesDistance-learning + research compute, GPU nodes.
How an MK server / storage project actually runs
Design workshop + sizing week 1
Workload review with application owners.
Procurement → delivery → DC racking
PO raised, delivery into MK DC, engineer attends.
Configuration + handover
Cluster config, storage provisioning, fabric configuration.
Support contract activates day one
Servnet support live from go-live.
MK servers + storage — common questions
Can you rack into ARK Cody or Pulsant MKE?
Yes — standing access.
What do you spec for corporate-HQ infrastructure?
Production-grade compute + storage at scale, with active/active multi-site for 24×7 resilience.
Do you do AI / GPU clusters for OU + Cranfield + Red Bull Racing?
Yes — NVIDIA DGX and Supermicro HGX builds.
Can you do a Nutanix design for NHS BLMK?
Yes — frequent design choice post-Broadcom.
Who supports the kit after install?
Servnet — under a Servnet support contract.
How do you price against MK integrators?
On hardware and licence typically 4–9% under list.
Other services we deliver in Milton Keynes
Sizing an MK server, storage or HCI project?
Tell us the workload, the DC and the timeline.